How lengthy does it take to put in solar panels?

| |

So you've decided to switch to solar energy – congratulations! This decision benefits the environment and cuts your energy costs in the short term. But how long will it take to have your system fully installed and ready to power your home or facility? The solar installation process involves much more than the installation itself. This is how long it takes to install solar panels.

Choose an installer

Before solar panels can be installed, you must first select an installer to complete the project for you. Research solar companies in your area and decide which one best fits your needs. This step can take as long or as short a time as you need to gather the information you need. Click HERE to see if your installer of choice has been named 2021 NYSERDA Quality Solar Installer.

Perform a site assessment

After selecting a contractor, a solar specialist from the company evaluates the location where the solar modules will be installed. Initial assessments can be made over the phone. The professional will examine your roof and the location of your home to determine which type of system is best. Initial telephone assessments and a meeting on a proposal specific to your home can be completed within a week.

Approval / utility interface

Solar panels cannot be installed without the necessary government and utility permits. Companies like Solar Liberty will investigate your local utility laws and guidelines to find out which permits you will need. Since the length of time it takes to get a permit depends on the government and utility company, this step can take anywhere from a week to months.

Install the panels

The actual installation of solar panels only takes one to three days, making it the fastest step in the process. The exact time it takes to install depends on how large or complex your roof is. The size and type of solar system you have installed also matters.

Schedule an inspection

Once the system is installed, it must be checked before connecting to the mains. This process usually takes about a week, but can sometimes take up to a month.

Complete the utility connection

After all, after passing the inspection, your solar modules must be approved for connection to the power grid. Your installer will file an application with your utility and someone from the company will come to inspect your system. Once approved, the system can be connected to your utilities. This step can take three to six weeks between inspection, approval and connection.

Given the time it takes to install solar panels, start the process once you have decided to switch to solar power. If you are looking to install solar panels in New York then you should select Solar Liberty as your installer. We offer installation services that include the steps above and offer free solar ratings to help you decide whether switching to solar power is the right choice for you.

Previous

BLUETTI EP500 launched: Big solar battery with 5100 watt hours – Gizchina.com

Apple affords free watch repairs if the software program replace would not repair charging points – Yahoo Tech

Next